08/22/2026
A big thanks for Lucas and Jenna Shelton for the opportunity to give their bathroom shower a makeover. The old shower had outlived it's life expectancy and needed a replacement. We decided to put in a shower in a similar footprint using a Schluter style shower system.
*The old pre-fabricated shower was demolished and removed
*A custom mud-pack base was used to keep the plumbing in the same location, a 48 hour leak test was performed prior to tiling
*A new modern glass door enclosure was installed after tiling
We made our deadline and made a huge improvement to the look and operation of the bathroom!
Give me a call or send a message for help with your next bathroom improvement project!
502-514-9484