08/19/2026
The summer grind continues. Some work from the past few weeks. We worked on a lot of projects, including 3 septic systems ( one at Pagosa’s famous hobbit house), 5 different driveways, dug 2 more foundations, backfilled 2 foundations we dug a couple weeks ago, prepped for 4 concrete slabs, built a retaining wall, cleared trees for a homesite, and repaired a 6 inch cast iron waterline for a hotel!
At Markham Septic and Excavation we get it done and we get it done right!
Tomorrow we are starting a big project where the first step will be leveling the top of an entire hill by 8 feet before the excavation of the foundation even begins.