09/08/2026
Athens County Slip Repair Update ๐ง
Things are really starting to take shape in Athens!
The drilled shafts are complete and the soldier piles are in place. Today, our crew will be pouring the footer for the drainage system and beginning installation of the precast concrete lagging panels between the piles.
Once the lagging starts going in, this project is going to look a whole lot different in a hurry.
Another step closer to getting this hillside stabilized and the roadway put back together. Great work by our crew keeping things moving! ๐ทโโ๏ธ๐๏ธ