100% SIGNS

Call Directions Website Contact the business

100% SIGNS Professional signage solutions that help businesses and organizations stand out.

SERVING THE CONTINENTAL US

From storefronts and vehicle wraps to hospitals, airports, and municipalities—we bring your vision to life with quality, compliance, and care.

National brands come to us because they've been burned before.They've worked with local vendors who couldn't match the b...
11/09/2026

National brands come to us because they've been burned before.

They've worked with local vendors who couldn't match the brand standards. They've had rollouts where location 7 looks different from location 2. They've had production delays that broke the campaign timing.

What a multi-location rollout actually requires:

→ A single point of coordination across all sites
→ Material and color consistency across every installation
→ Installation scheduling that accounts for local constraints and store hours
→ Quality checks at each location before the job is closed

It sounds straightforward. It's not. That's why brands with real distribution networks invest in signage partners, not just sign vendors.

We just completed a four-location rollout for Pollo Campero across South Florida. On time. Consistent. Done right.

If you manage multiple locations or work with brands that do, let's talk about how we approach program work.

With Q4 underway, we've been thinking about what separates the signage projects that go smoothly from the ones that don'...
10/30/2026

With Q4 underway, we've been thinking about what separates the signage projects that go smoothly from the ones that don't.

It's almost never the complexity of the project itself.

The projects that run well share a few things: the signage contractor is brought in before the design is locked. ADA and local code requirements are confirmed before the sign schedule is finalized. Permit applications are filed before they're needed, not when they are. And the team on the ground communicates like partners, not subcontractors.

The projects that don't run well almost always have the inverse: signage treated as a commodity line item, awarded late, to the lowest bidder, with no one taking ownership of the coordination between design, compliance, permits, and install.

The work we're most proud of isn't the most visible. It's the project nobody noticed — because it ran exactly the way it was supposed to.

If you want your next project to run the way it should, let's talk now while the schedule has room.

We don't talk about ourselves as much as we probably should.So here's what the people we work with say:"They caught an A...
10/27/2026

We don't talk about ourselves as much as we probably should.

So here's what the people we work with say:

"They caught an ADA issue in our drawings that nobody else flagged. Saved us from failing inspection."

"I've worked with a lot of sign companies. Most of them hand you a quote and disappear. These guys are in it with you."

"We called them three weeks before CO. They figured it out. Signs were up, inspection passed, we opened on time."

"The project manager knew our job better than some of my own subs by the time we got to install."

Complex projects require partners who take them seriously. That's what we try to be, every time.

See our work — link in bio. Or reach out to start a conversation about your project.

Exterior signage takes more than most people expect to do correctly.Material selection has to account for UV exposure, t...
10/23/2026

Exterior signage takes more than most people expect to do correctly.

Material selection has to account for UV exposure, thermal expansion, wind load, and fastening into the specific substrate of the building — concrete, EIFS, metal panel, masonry. Every combination is different. Every municipality has its own wind load and setback requirements.

Lighting — LED channel letters, halo-lit elements, backlit panels — needs electrical rough-in coordination, which means the signage contractor has to be in sync with the electrician and the GC well before installation day.

And the permit process for exterior signs is often more involved than interior: site plan reviews, landlord approvals, historic district considerations in some markets, and inspection requirements that can't be rushed.

If your building has exterior signage that's been deferred, or a new project coming up that needs exterior ID, now is the right time to start. The projects that get moving in October are the ones that install cleanly in Q1.

Planning exterior signage? Start the conversation now and we'll have your timeline mapped before year-end.

One of the most common questions we get from developers and facility managers: should this be a static sign or a digital...
10/21/2026

One of the most common questions we get from developers and facility managers: should this be a static sign or a digital display?

The honest answer: it depends on what the sign needs to do.

Static signage is right when the information is permanent or changes rarely. ADA room identification, building directories with stable tenants, regulatory and code-required signage, monument and exterior ID — static is more durable, lower cost to maintain, and in many cases more readable in variable lighting conditions.

Digital signage earns its cost when information changes frequently, when you're managing multiple messages across a large audience, or when real-time updates (gate changes, event schedules, wayfinding in complex environments) justify the infrastructure.

The mistake we see: defaulting to digital because it feels more modern, without a clear operational plan for managing content. A digital sign with outdated or blank content communicates the opposite of what you intended.

The best signage systems integrate both — each type doing what it does best.

Spec-ing a new project? We can walk you through the decision framework. Reach out.

We use the phrase "project partner" a lot. Here's what that actually looked like on a recent job.A GC reached out three ...
10/19/2026

We use the phrase "project partner" a lot. Here's what that actually looked like on a recent job.

A GC reached out three weeks before a scheduled CO date. The signage scope hadn't been confirmed. Permits hadn't been pulled. The sign package the architect had specced was missing ADA elements for six permanent room ID locations.

In three weeks, we pulled the permit applications for the municipality. Revised the sign schedule to include the missing ADA elements. Coordinated production on an accelerated timeline. Installed on schedule, passed inspection, CO was issued on time.

Not every project gets rescued at the finish line. We'd rather be involved from the start. But when it matters, we show up and figure it out.

That's what a real partner does.

Whatever stage your project is at, we're ready to step in. Let's talk.

If you're a developer or GC with projects targeting delivery in 2027, here's a question worth asking in October:When doe...
10/16/2026

If you're a developer or GC with projects targeting delivery in 2027, here's a question worth asking in October:

When does signage need to be in the conversation?

The answer, for most large commercial projects, is earlier than it typically is.

Design decisions made in schematic and design development phases affect signage — architectural integration, wall placement, electrical rough-in locations, ADA compliance planning. Changes that cost an hour in design cost significantly more in the field.

Material selection for exterior sign programs needs to be confirmed well before fabrication. Permit applications in many markets take 6–10 weeks. For complex projects — airports, healthcare, mixed-use developments — the sign type schedule alone requires weeks of coordination.

Starting the signage conversation now means arriving at 2027 with a plan, not a problem.

We offer early-stage project consultations at no cost. If you have something in development, we'd welcome the conversation.

Signage permits don't work on your timeline. They work on the municipality's timeline.And in Q4, that timeline compresse...
10/14/2026

Signage permits don't work on your timeline. They work on the municipality's timeline.

And in Q4, that timeline compresses.

Here's what happens: city and county permit offices reduce staffing around the holidays. Backlogs that might take two weeks to process in July can stretch to four to six weeks in November and December. If your project needs multiple permit types — electrical, structural, right-of-way — you're stacking those timelines.

For a GC trying to close out a job by year-end, an unexpected permit delay on signage can hold up the certificate of occupancy. We've seen it.

The fix is starting earlier and working with a sign contractor who knows the permit landscape in your specific market. Not every municipality processes the same way. Local experience matters.

If you're targeting a late Q4 or early Q1 completion, now is the right time to have the permit conversation — not after the rest of the project is done.

We manage permit coordination as part of every project. Reach out to start the process.

There's a window every year that most commercial property owners and developers don't take full advantage of.Capital imp...
10/12/2026

There's a window every year that most commercial property owners and developers don't take full advantage of.

Capital improvements — including signage — purchased and placed into service before December 31st can qualify for immediate expensing under Section 179. That's a meaningful difference when you're evaluating a signage project that's been sitting on the list.

Beyond the tax timing: Q4 is typically when production capacity is still available, before the year-end rush compresses everything in November and December. It's when the projects that get planned now come in smoother than the ones that get planned in January under pressure.

We're not accountants. Talk to yours about what applies to your situation.

But if you have a signage project that's been waiting for the right moment — Q4 is a compelling argument for moving it forward.

Ready to move your project forward before year-end? Let's get the scope conversation started.

Q4 is the busiest time of year for lease turnover — and with it comes one of the most overlooked signage challenges in c...
10/09/2026

Q4 is the busiest time of year for lease turnover — and with it comes one of the most overlooked signage challenges in commercial real estate: tenant improvement sign packages.

When a new tenant moves in, the signage rarely starts from zero. It starts from whatever the previous tenant left behind — and then layers on what the new tenant needs, what the building requires, and what the lease dictates.

Done right, a TI sign package aligns the new tenant's brand with the building's existing signage standards, meets ADA requirements for any permanently identified spaces, and holds up through the next lease cycle.

Done in a rush — which is what happens when it gets addressed in week three of a four-week buildout — it creates inconsistencies that compound over time.

If you manage commercial properties or are working on TI projects heading into year-end, let's talk about what a clean sign package looks like from the start.

TI signage moving fast? We specialize in project coordination under compressed timelines. Let's talk.

Address

20861 Johnson Street Ste 115
Pembroke Pines, FL
33039

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm

Telephone

+15614777094

Alerts

Be the first to know and let us send you an email when 100% SIGNS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to 100% SIGNS:

Shortcuts

Share

Nearby businesses