07/20/2013
This is a complete picture of the 1999 370 Searay Aft Cabin. The Flybridge enclosure was done last summer and the Aft Deck was this Spring...after the snow
:) The front was too high for me to reach, so with some good ol' ingenuity from the marina we constructed a scaffolding that rested on the frame of the covered slip !