06/16/2026
Your line is running. Your products are shipping. Quality control is passing everything.
And you're giving away $273,500 a year.
Product giveaway — overfilling containers beyond declared net weight — is one of the most expensive problems in manufacturing. It generates zero complaints. Zero rejects. Zero alerts.
It just quietly ships to every customer, at your expense.
Here's how the math works on a single line:
18g average overfill
× $0.0042 per gram (product cost)
× 4,800 units per shift
× 3 shifts per day
× 250 production days
= $273,500 given away. Per line. Per year.
Most manufacturers haven't calculated this number recently. Many have never calculated it at all — because nothing in the operation signals that it needs to be calculated.
We wrote a breakdown of what product giveaway is, where it comes from, and how in-motion weighing technology closes the feedback loop that lets it keep happening.
If you run a filling or packaging line, this one is worth the 6 minutes.
🔗https://hubs.la/Q04g_dPM0