06/24/2022
The installation time is affected by the complexity of the design, the layout of the roof, the dimensions and other factors in the selection of panels. Usually the whole process takes from several weeks to a couple of months, which includes project development, prefabricated frame production and installation. In any case, it is faster and better than an independent connection.