Alamo Transformer Supply Company

Call Directions Website

Alamo Transformer Supply Company Whether repairing, rewinding, renting or recycling… Buying new or reconditioned…
ATSCO is here to service all your transformer needs.

Winding Wednesday ALAMO Winding Supervisor, before removing the steel press plates, inspects this rewound 3 phase core a...
10/14/2026

Winding Wednesday


ALAMO Winding Supervisor, before removing the steel press plates, inspects this rewound 3 phase core and coil after baking and pressing the coils in the oven.

The process of rewinding and pressing a three-phase core and coil:

-Baking and pressing: Each coil is individually pressed before the unit goes into the oven. After baking, the coils are pressed again to set their shape.

-Supervisor inspection: With the steel press plates still in place, our Winding Supervisor reviews the rewound core and coil. Checking at this stage confirms the baking and pressing came out right before moving on.

-Ready for stacking: Once the unit comes out of the oven and passes inspection, it's ready for stacking. Baking and pressing is the stage that comes right before it.


Every coil is inspected, every step checked. Call ALAMO for rewinding you can trust.


San Antonio 210-661-8411 or Houston 713-991-6060


[email protected]


www.https://alamotransformer.com


www.https://newhartservices.com

Transformer Tuesday  This 3-phase sub with lid mounted elevated manhole covers over the HV and LV interior tank connecti...
10/13/2026

Transformer Tuesday


This 3-phase sub with lid mounted elevated manhole covers over the HV and LV interior tank connections stands at attention waiting for its primer coat to dry.

Painting is about more than looks. It's the transformer's first line of defense against the Texas sun but also a protective coating against the harsh corrosive gulf coast conditions or plant environments. After surface prep and primer, ALAMO finishes the unit with a two-part acrylic urethane coating, known for its durable finish, UV resistance, gloss retention and corrosion prevention.


From repairs and rewinds to in-plant coating and field services, ALAMO Safely Produces Quality Transformer Solutions.

Need a transformer repainted or refurbished? Call Us!

San Antonio 210-661-8411 or Houston 713-991-6060

[email protected]


www.https://alamotransformer.com

www.https://newhartservices.com

Feature Friday 🎉 7,000 LinkedIn Followers!We’re excited to celebrate reaching 7,000 followers and are grateful for every...
10/09/2026

Feature Friday
🎉 7,000 LinkedIn Followers!

We’re excited to celebrate reaching 7,000 followers and are grateful for everyone who continues to support ALAMO Transformer. Your likes, comments, shares, and follows help us grow our community and continue delivering reliable Transformer Solutions.

For more than 63 years, ALAMO has proudly served San Antonio, Houston, and the Gulf Coast, providing dependable solutions for a wide range of transformer needs.

From repairs, rewinds, rentals, recycling, and sales of new and reconditioned transformers to transformer parts, in-plant coating, and field services, we’re proud to keep powering the communities and industries we serve.

Thank you for being part of our journey. Here’s to continuing to !

San Antonio 210-661-8411 or Houston 713-991-6060

[email protected]

www.https://alamotransformer.com

www.https://newhartservices.com

Winding Wednesday  The winding process begins with rectangular coils that are pressed and baked at approximately 300°F. ...
10/07/2026

Winding Wednesday

The winding process begins with rectangular coils that are pressed and baked at approximately 300°F. This baking process seals the insulation paper around the coils. After baking, the coils return to the production area, where they are landed and positioned correctly. Workers then stack the coils and assemble the frame around them. After the frame is in place, the coils are connected, and the necessary electrical hookups are completed. Additional connections may still be required before the unit moves to the next stage. During assembly, testing is performed to ensure everything functions properly. A turns-ratio test (TTR) is conducted to verify the voltage ratios and confirm that the voltage and ratios meet the required specifications before the assembly is finished.


Give ALAMO a call Today!

San Antonio 210-661-8411 or Houston 713-991-6060


[email protected]


www.alamotransformer.com

www.newhartservices.com


Transformer Tuesday   ALAMO San Antonio is completing a high-volume, quick-turnaround emergency repair project to help g...
10/06/2026

Transformer Tuesday


ALAMO San Antonio is completing a high-volume, quick-turnaround emergency repair project to help get multiple end users back in service. Each unit is carefully opened, inspected, repaired internally, and reassembled by our experienced team before receiving final tests. After testing, they will receive our corrosion-prevention of industrial coating to further extend the lives of these transformers.

Everything ALAMO does is with a focus on quality, efficiency, and reliable results.

Call us today to find YOUR Transformer Solution!


San Antonio 210-661-8411 or Houston 713-991-6060


[email protected]

www.alamotransformer.com


www.newhartservices.com


Fabrication FridayThe ALAMO team is preparing to fabricate a new base, as this customer's substation was in a desperate ...
10/02/2026

Fabrication Friday

The ALAMO team is preparing to fabricate a new base, as this customer's substation was in a desperate state of deterioration, having been subjected to a highly corrosive environment inside a refinery.

The Solution... ALAMO extends the life of this customer's transformer by fabricating a new base and adding a rust-bond primer and a life extending epoxy urethane coating.

San Antonio 210 661-8411 or Houston 713 991-6060

[email protected]

www.alamotransformer.com

www.newhartservices.com

Winding Wednesday  Our ALAMO San Antonio winding team just finished rewinding 4 of 6 of these double stacked cylindrical...
09/30/2026

Winding Wednesday

Our ALAMO San Antonio winding team just finished rewinding 4 of 6 of these double stacked cylindrical copper coils for a customer owned 4000kVA Substation.

The last 2 coils are in the process of being completed, and then the set will head to the bakeout oven, where it will be baked at temperature to thermally set the Diamond Kraft Epoxy Paper.

Give us a call!

San Antonio 210 661-8411 or Houston 713 991-6060

[email protected]

www.alamotransformer.com

www.newhartservices.com

Transformer TuesdayWhen reliability matters, ALAMO is there to help. Our Houston team performed a complete rebuild of th...
09/29/2026

Transformer Tuesday

When reliability matters, ALAMO is there to help. Our Houston team performed a complete rebuild of this customer's Substation Transformer by adding new elevated manhole covers, SPRD, Under-Oil Rapid Rise Relay, Winding Temp Gauge, Liquid level, Pressure and Temperature gauges, all with contacts to monitor critical path transformers.

Fully reconditioned, this Substation is ready for energization and should look forward to many more years of reliable service.

If you are looking for reliability, quality, and service, give us a call.

San Antonio 210 661-8411 or Houston 713 991-6060

[email protected]

www.alamotransformer.com

www.newhartservices.com

Feature Friday ALAMO stocks small footprint substation transformers custom built for customers needing a Transformer Sol...
09/25/2026

Feature Friday

ALAMO stocks small footprint substation transformers custom built for customers needing a Transformer Solution on short order. These subs are ready to ship and can cover a voltage range of 5 kV, 15 kV, 25 kV, and 35 kV.

They are ready to ship when you need them, keeping you and your customers when you need it most.

Contact us TODAY!

San Antonio 210 661-8411 or Houston 713 991-6060

[email protected]

www.alamotransformer.com

www.newhartservices.com

Winding Shop WednesdayThe ALAMO Winding Shop Team has landed 2 of the 3 circular coils on this 3 legged core. The circul...
09/23/2026

Winding Shop Wednesday

The ALAMO Winding Shop Team has landed 2 of the 3 circular coils on this 3 legged core. The circular coil design creates symmetrical, cylindrical windings that naturally resist radial short-circuit forces and offer exceptional mechanical strength and efficient thermal performance, extending the life of the newly wound coils.

If you want a Transformer Solution that you can rely on, give us a call!

San Antonio 210 661-8411 or Houston 713 991-6060

[email protected]

www.alamotransformer.com

www.newhartservices.com

Address

4931 Space Center Drive
San Antonio, TX
78218

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+12106618411

Alerts

Be the first to know and let us send you an email when Alamo Transformer Supply Company posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Sponsored

Share