07/29/2026
LIQUID-COOLED AI DATA CENTER CAPACITY
High-Density GPU Infrastructure – Available Now
---
FACILITY OVERVIEW
Location: Upstate South Carolina (Seneca / Clemson region)
Use Case: AI training clusters, high-density GPU nodes, HPC workloads
Availability: Immediate (Phase 1 capacity online)
---
POWER & DENSITY
- Total Available Capacity (Phase 1): 350 kW available now
- Per Rack Density: Up to 400 kW per rack (design maximum)
- Designed for: GPU-intensive AI / ML workloads
---
COOLING INFRASTRUCTURE
- Cooling Type: Liquid cooling (direct-to-chip / high-density capable)
- Optimized for: NVIDIA HGX / H100 / Blackwell-class systems and similar
- Thermal Design: Built for sustained high-load AI training environments
- Redundancy: Industrial-grade cooling resilience (N+1 design)
---
POWER INFRASTRUCTURE
- Utility Power: Secured and available
- Redundancy: Tier 3–aligned design
- Backup Systems: Generator-backed with on-site fuel capability
- High-efficiency distribution for dense compute loads
- Current Deployable Block: 350 kW immediately available for allocation
---
NETWORK & CONNECTIVITY
- Carrier-neutral design
- High-capacity fiber connectivity
- Low-latency access to Southeast and East Coast markets
- Custom bandwidth options available
---
DEPLOYMENT OPTIONS
- Full rack deployments (high-density)
- Private cage / dedicated pod
- Build-to-suit AI clusters
- Turnkey deployment support available
- Immediate deployment available for 350 kW allocation
---
TARGET CUSTOMERS
- AI / ML companies training large models
- GPU cloud / neocloud providers
- Enterprise AI teams scaling compute
- Hedge funds / research compute users
---
COMPETITIVE ADVANTAGES
- Immediate availability (350 kW deployable now)
- Extreme rack density (400 kW vs typical 10–40 kW)
- Lower cost than Tier 1 markets (Ashburn, Silicon Valley)
- Designed specifically for AI workloads—not retrofitted
- Rapid deployment timelines
---
PRICING (INDICATIVE)
- Flexible structure based on:
- kW commitment
- term length
- deployment size
- All-in or power-based pricing available upon request
---
CURRENT AVAILABILITY
- 350 kW of high-density power available immediately
- Additional high-density racks available in Phase 1 expansion
- Priority given to multi-rack deployments
---
CONTACT
Operator: Technology Solutions of SC Inc.
Project: Seneca AI Data Centers
Inquiries: 864-882-9194
Response Time: Same-day for qualified opportunities
If you are constrained by power availability, cooling limits, or deployment timelines, this facility is designed to remove those bottlenecks and enable rapid scaling of AI infrastructure.