04/23/2026
The day modules start going into place never gets old.
By the time the solar modules are placed in the racking, weeks of groundwork are already behind the team—hundreds of blocks set, miles of wire run, thousands of bolts tightened. And that’s all before lifting and placing hundreds of 75-lb modules into position.
It’s a milestone moment on every project—and a reflection of the grit, precision, and discipline our construction teams bring to the field every day.
Proud of our crews who continue across the country.