09/02/2026
Counsilman-Hunsaker provided aquatic design and engineering services for the Baltimore Ravens' Under Armour Performance Center. "The Castle" is the team's headquarters and elite training complex. The project delivered a new hydrotherapy and wellness suite as part of a ~20,000-square-foot renovation, purpose-built for professional athlete recovery and sports medicine integration.
Highlights include a 50-foot, two-lane lap pool with variable-depth lanes for aquatic therapy and low-impact conditioning, hot and cold plunge pools totaling over 650 sq. ft. for contrast hydrotherapy, and an integrated HydroWorx 2000 underwater treadmill.
Featured in Athletic Business magazine's 2026 "Architectural Showcase."
Aquatic Suppliers:
Hydrotherapy Tanks – Hydroworx
Cold Plunge Tubs – Grimm Scientific
Spas/Hot Tubs – Daltile
Access Ramps/Stairs – Daltile
Access Ramps/Stairs – Paragon Aquatics
Access Ramps/Stairs – PebbleTechnology
ADA Lifts – Spectrum Aquatics
Basin Surface – Daltile, PebbleTechnology
Chemical Control Systems – Hayward
Cleaners/Vacuums (Skimmers) – Aquastar
Deck (Primary Surface) – Daltile
Deck Drains – SlotDrain Systems
Dehumidifiers – Dectron
Filtration (Flow Meters/Pumps) – Flowvis
Filtration (Pumps) – Speck
Lighting (In-Pool) – Pentair
Sanitization (Chemical Controllers) – Hayward
Sanitization Systems – Neptune Benson/ Xylem
Sanitization (Chemical Feeders) – Pentair