07/24/2026
Finally after a long wait things are starting to shape up here at the job site, the barn was finished out and trim work done. A new building pad was put in for the two small sheds to be moved and set onto to open up the driveway. After the sheds get moved the driveway gets extended and the landscaping and stone done around the building to really make it look good. The pad is all graded out for laying rebar and rebar chairs and next step is concrete! Be on the look out for the finishing pictures of this job that will show the concrete floor, gutters, landscaping, and the fine tunings of this job!