10/02/2026
This job has been a wild ride! What started out as looking like a weeks worth has expanded into over a months worth of work! Over 100 hours invested, estimated to have moved over 1000 tons of material, and spread over 155 tons of gravel, and 90 tons of dirt. Estimated 300 gallons of fuel, probably 25 gallons of hydraulic oil (I don’t wanna talk about it 😂) 4 hose repairs, 2 new hydraulic fittings 1 new track, 1 new sprocket, and probably 50 something chicken strips later between me and Caden Sullins 😂, and this is the final product! Please take your time scrolling through all the pictures. This job has been a labor of love and I wanted to give my best on the big jobs as well as the small ones! The picture of the pickup truck and the last picture of me is for reference to how tall the hillside was. Pictures don’t do it justice. That’s a ram 1500 parked against the hillside, and I’m just a couple inches short of 6ft, and the hillside is over double my height! This was a lot of material to move with what felt like a little shovel! Please leave a comment or something on this post, I don’t want to brag much, but I think I’ve earned it on this job. It’s wore me out! 😂
If you want something done like this, as much as it pains me to say it, please give me a call or send me a message!
615-680-2097
WallersLandServices.org