12/31/2024
Finished the 2nd half of the Seymour house. All the bedrooms got new Sheetrock, textured walls, paint, baseboards, new doors and hardware. New electrical outlets, switches and ceiling fans. Along with new flooring. Garage walls even got new Sheetrock, texture and paint. Even installed a new cedar mailbox post with new mailbox to match other cedar exterior trim.