10/16/2026
Permits approved and we're on site. Our crew is tearing off the existing gravel built-up roof on this commercial building and replacing it with a Duro-Last single-ply system — backed by a full manufacturer warranty.
As a Duro-Last certified contractor, we self-perform the entire scope: tear-off, deck prep, insulation, membrane, and final inspection. No subs, one point of contact.
Flat roof leaking, ponding, or past its life? Call 817-757-9776 for an assessment.