Keystone CSA is a local specialty contractor dedicated to servicing data center environmental support systems including CRAC, UPS, Battery, Power Distribution, Generator, Fire Protection, and Monitoring equipment in the Central & South Florida region Information Technology Construction and Maintenance: Keystone Critical Systems provides design, budgeting, installation, maintenance services and on-

going support for environmental equipment utilized in IT facilities

Information Technology Environmental Support
Computer Room A/C Service and Installation
UPS, Battery, Power Distribution, Generator,
ATS, Monitoring & Full Turn-Key Design Build

Keystone CSA is able to mitigate risk and provide industry best practice by:
> Providing advance levels of detail with dedicated data center technicians
> Understanding the electro-mechanical operations with in-house engineers


FL License: CBC1251172 & CAC1814851

  was entrusted with a critical mission: to enhance equipment performance while minimizing  . Our latest project involve...
04/01/2024

was entrusted with a critical mission: to enhance equipment performance while minimizing . Our latest project involved upgrading water control gate valves for existing Computer Room Air Handlers in a fully operational . Characterized Control Ball Valves and Actuators were specified in order to provide enhanced valve control, energy savings, and prolonged valve lifespan. Elevate your operations with Keystone's expertise!

09/20/2023

Here at we have assisted users in all or some of these . Each with their own benefits. Sunbird Software has published an ebook worthy of a quick read for any party considering any of these options.

For further inquiries please reach out and our Sales Engineers would be happy to help. (561)242-0842

How do your   service vendors mitigate risk and equipment downtime? We are continuously working with clients on a 3-pron...
07/05/2023

How do your service vendors mitigate risk and equipment downtime? We are continuously working with clients on a 3-pronged approach:
1) Customized spare parts crash kit that are stored on site.
2) All service vans have a full inventory of Computer Room A/C replacement parts for common failure items.
3) Our warehouse inventories long lead time parts like microchannel condenser coils as shown below.

With   specializing in the     industry, the customer gets an end product with next level attention to detail including:...
04/24/2023

With specializing in the industry, the customer gets an end product with next level attention to detail including:

1) Expertise on the equipment, and proper system operations, which in turn provides the project planning foresight for a smooth installation.
2) Field Staff that is in data centers every day and knows how to conduct themselves to provide worry-free onsite visits.
3) A team that understands and utilizes industry best practices to provide equipment longevity without problems that surface down the road from poor installation.

Heat Load Analysis is not only an evaluation on the space's heat load vs cooling capacity, but also a review of   effici...
04/14/2023

Heat Load Analysis is not only an evaluation on the space's heat load vs cooling capacity, but also a review of efficiency. Below are a few of industry best practices that we discuss during one of these studies:

1) Using blanking panels to keep hot air in the hot aisle
2) Using proper to create a clear path for exhaust air
3) Placing A/C supply / return pathways optimally
4) Using 2021 ASHRAE TC9.9 recommended setpoints
5) Sealing the envelope of the room to retain cool air
6) Removing cardboard from the space, as it absorbs moisture with more load on the A/C equipment

Cooling Capacity is only half of the   equation. The other forgotten half is air flow. The Keystone Team helped a client...
03/23/2023

Cooling Capacity is only half of the equation. The other forgotten half is air flow. The Keystone Team helped a client with air containment to reduce hot spots, provide and increase equipment life cycle.

How do you   a newly installed  ,  ,  ,  , Computer Room A/C, or   component before bringing it online to an active  ? O...
03/01/2023

How do you a newly installed , , , , Computer Room A/C, or component before bringing it online to an active ? Only Component Acceptance Testing or Full Integrated System Testing?

One of the many benefits for 3rd Party is the Integrated Testing agent provides an independent assessment outside of designer/installer including a full systems test to ensure all of the different system components work together prior to the builder handoff to the owner.

For more information check out our blog:
https://keystonecsa.com/nfpa-4-fire-protection-integrated-testing-within-the-data-center/

The fire protection apparatus within a data center is a complex array of systems performing various functions that must operate in synergy if and when a fire emergency occurs. At any given facility, the installed systems are spread across different installation and or service vendors that may includ...

On top of the on going daily pressures to maintain zero critical bus loss, are you tasked with planning a data center up...
02/14/2023

On top of the on going daily pressures to maintain zero critical bus loss, are you tasked with planning a data center upgrade project? This article discusses the best path forward and how to deliver.

https://keystonecsa.com/choosing-a-data-center-specialty-design-build-contractor/

Data center managers have a tremendous work load to maintain high sigma reliability for the entire workings of a data center. The ongoing daily pressure to maintain zero critical bus loss weighs heavily on one’s conscious. It’s a 7×24 challenge and now company management has added to that work ...

  has a new cooling solution;   CWA for   solutions. Product removes the need for access flooring. Imagine stepping in f...
06/01/2021

has a new cooling solution; CWA for solutions. Product removes the need for access flooring. Imagine stepping in front of one? Hurricane force winds?!?



Vertiv™ Liebert CWA is designed to help cloud and large co-located data centers achieve their goals, such as reducing first cost and increasing speed-to-mark...

Do you have pesky    in your Data Center with raised access flooring?First, what is a hot spot? And No, its not your mob...
05/27/2021

Do you have pesky in your Data Center with raised access flooring?

First, what is a hot spot? And No, its not your mobile device sharing the internet connection with your computer. The definition of a hot spot in your data center is a location at the intake of IT equipment where the measured temperature is greater than the expected value as recommended by . Hot spots most often occur towards the top of the rack.

management is an easy and cost effective way to permanently eliminate hot spots while saving energy and avoiding capital expense of adding more cooling. 68% tiles were installed in a clients higher heat density row giving the IT equipment 93% TAC ). These tiles are 68% open and delivers up to 2,600 cfm @ .1 H2O. More importantly, each vertical vane has an angle of deflection at the top to direct the air flow towards the server rack to achieve the 93% TAC rate compared to a standard floor tile which only delivers 30-50% TAC to the rack. This improvement enables the tile to efficiently cool up to 25Kw per rack!

Top picture is the standard tile and the bottom picture is the Directaire 68% open tile.

Increasing condenser leg height optimized airflow,  , and overall health of the   equipment for a   facility with high h...
02/25/2021

Increasing condenser leg height optimized airflow, , and overall health of the equipment for a facility with high heat densities.

AT&T's Regional Hub faced multiple levels of damage from the Christmas morning bombing in   but was able to restore majo...
12/28/2020

AT&T's Regional Hub faced multiple levels of damage from the Christmas morning bombing in but was able to restore majority of services within 72 hours.

This horrific event shows the vulnerability of data / telecom centers as well as the importance of with a team of local resources on speed dial to assist.



AT&T is rebuilding its regional network and infrastructure after the Christmas day explosion that damaged its telecom hub in Nashville.

Address

4050 Westgate Avenue Ste 105
West Palm Beach, FL
33409

Alerts

Be the first to know and let us send you an email when Keystone Critical Systems & Advisors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Keystone Critical Systems & Advisors:

Share