09/21/2026
For the depth the first photo is a code compliant repair or clean out installation with shear guard couplings to transition from PVC to the clay so that it does not become offset and to know what direction the sewer cable is going in the situation of a backup the prior work created a blockage due to an offset as pictured and could not be cleaned due to being full of water and unsure of direction of sewer cable.
⭐️⭐️⭐️⭐️⭐️ 316-312-6639