05/21/2026
The new School of Aviation building at Elizabeth City State University is beginning to take shape, and we're proud to support the project alongside Baker Mechanical.
This 57,000-square-foot facility will provide future aviation professionals with advanced classrooms, flight simulators, drone labs, collaborative learning spaces, and other specialized training environments designed to support the next generation of pilots, engineers, and aerospace leaders.
For this project, MKT supplied oval, spiral, and rectangular ductwork. After three deliveries to date, the Baker Mechanical team reported that materials arrived clean, properly wrapped, and ready for installation with no logistics issues.
When schedules are tight and labor is at a premium, details matter. Accurate fabrication, dependable deliveries, and install-ready ductwork help crews stay productive and keep projects moving forward.