Town Design Development - PTY Ltd

Call Directions Website Contact the business

Town Design Development - PTY Ltd Town design development offers townplanning & building plan consultation for your property development.

Town Design Development (PTY) Ltd is a multi-disciplinary firm providing a range of town planning services, architectural services and building construction. We are situated in Bronkhorstspruit and consult in surrounding areas. Town design development has experience in all areas of planning and can support you at any stage in the process. We can start by looking at the potential of your site and can advise on the best approach to promote development. We manage the project from client brief, through concept design to town planning approval and release. All projects will be predicted on the economic, social and physical considerations of the environment and thus approval of plans will be determined by our local municipality. We specialize in:
• Any building plans required, from Carports to New House plans (3'D plans),
• Submission at councils for approval,
• Land Use Applications for Rezoning, Special Consents, Granny Flat applications (2nd Dwelling),
• Development concepts and layout planning.
• Region plans.
• Acquire Zoning Certificate
• Advice on built environment legislation.
• Township applications.
• Subdivisions and consolidations.
• Removal or amendment of restrictive title conditions.
• Tribunals and appeal cases.
• Collection of geographical information.
• Project co-ordination and management.
• Division of Land Applications
• Removal of Restrictive title deed conditions
• Permission Applications
• Draught of Building Plans
We offer our service mainly in Gauteng, but we also provide services in Limpopo, the Free State and Mpumalanga
In the process of compiling and managing applications, Town Design Development also coordinates the involvement of various other professions such as:
Engineers
Land surveyors
Geo-technical experts
Environmental experts
Architects
Legal experts

01/10/2026

For your subdivision needs, lets talk0845253061
31/08/2026

For your subdivision needs, lets talk
0845253061

16/08/2026
15/08/2026

15/08/2026

Got old rules on your title deed blocking your development plans?📜🏠That “only one house allowed” or “no business use” co...
08/06/2026

Got old rules on your title deed blocking your development plans?📜🏠

That “only one house allowed” or “no business use” condition from 1960 can stop your rezoning, subdivision, consent, permission or building plans dead.

Removal of Restrictive Conditions application.
The legal way to delete those old rules.

In plain English:
1. Why: Old title deeds often say you can’t run a business, subdivide, or build closer than 7m from the street. If your plans conflict, council will refuse you.
2. What it does: Asks Gauteng Province + Tshwane to legally erase that condition so you can use your land like everyone else.
3. When you need it: Rezoning to Business 1, subdividing your erf, building a second dwelling, opening a creche/shop from home.
4. How long: +/- 6-12 months. Runs at the same time as your rezoning/ consent/ permission so you don’t lose time.

Bottom line: If the Deeds Office says “no” but the Town Planning Scheme says “yes”, you probably need a Removal of Restrictions.

Own property in Tshwane/Bronkhorstspruit with weird old conditions?
DM us. We check your title deed for free.

"Many homeowners skip this step because they assume that the driller will handle it, but the legal responsibility sits w...
24/05/2026

"Many homeowners skip this step because they assume that the driller will handle it, but the legal responsibility sits with the property owner.

Tshwane, eThekwini and Nelson Mandela Bay: Registration of the borehole is compulsory once drilling is complete."

https://dailyinvestor.com/property/134364/south-african-municipalities-crack-down-on-homeowners-with-boreholes-on-their-properties/?shem=dsdf,sharefoc,agadiscoversdl,,sh/x/discover/m1/4

South African municipalities are cracking down on non-compliant boreholes as more homeowners turn to private water sources, with non-compliance risking serious legal and financial consequences.

Solar power solutions - these systems need to register with Eskom or Municipality:"Small-scale embedded generation facil...
18/02/2026

Solar power solutions - these systems need to register with Eskom or Municipality:

"Small-scale embedded generation facilities with an installed capacity of 100kW or less and with a point of connection to the electricity grid are required to register with the relevant distributor, being Eskom or the applicable licenced municipality;
and
Embedded generation facilities with an installed capacity of more than 100 kW and apoint of connection to the grid are required to register directly with Nersa."

Nersa has clarified the registration requirements for residential solar and small-scale embedded generation installations, following concerns raised by Outa about unclear regulations.

Address

Bronkhorstspruit
1020

Opening Hours

Monday 09:00 - 15:00
Tuesday 09:00 - 15:00
Wednesday 09:00 - 15:00
Thursday 09:00 - 15:00
Friday 09:00 - 00:00

Telephone

+27845253061

Alerts

Be the first to know and let us send you an email when Town Design Development - PTY Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Town Design Development - PTY Ltd:

Shortcuts

Share