22/10/2026
Before the testing starts, we test the setup. 🚩
At the Virginia Solar PV Plant (240 MW), numerous tests will be required to test the existing earth against the design.
Record keeping and consistency in testing method are critical. For this project we needed to:
• Repeat the method.
• Record the data
• Recreate the same testing environment
So Carel trialled a simple idea: numbered flags marking each measuring point, so every reading is recorded against a flag number.
How it works with two people:
• One records the data.
• The other moves the clamp to the next test spike.
Both can confirm where they are, which test was just done, and what comes next, without recounting the spikes every time.
Across the big areas we’ll be covering, that means readings you can repeat, compare and trust. The verdict to the team: “a game changer” for the field.
Good results start with a good, reliable setup. ⚡
Follow along as we build up to our live Lightning & Surge Protection training.