Great forward thinking from the Deo Solar team on their latest project in Tanzania!
With two containerised Sigenergy systems destined for a gold mine’s crusher plant and power house, the team recognised the potential logistical and technical challenges of installing in a region where specialised resources may be less accessible.
Rather than addressing these challenges on site, DEO Solar took the initiative to assemble and pre-commission both systems here in South Africa, helping ensure a smoother installation process once they reach Tanzania.
The systems include:
• System 1: 1.2MW AC | 1.3MWh | 2.4MW Gateway
• System 2: 900kW AC | 1.1MWh | 2MW Gateway
A well-deserved acknowledgement to DEO Solar for their foresight and preparation, and to Yugi for the pre-commissioning work.
One of our SIAAC engineers will be joining the team in Tanzania for the full installation. Looking forward to seeing the next phase come together!