VBS Maintenance

VBS Maintenance Rigging, Transport, Engineering, Industrial Cleaning, Sign erect and Writing

Vaughn Vollmer
24/02/2026

Vaughn Vollmer

VBS Maintenance rigging team successfully completed critical work on a 2800 Rope Shovel.Through careful planning, safe l...
21/02/2026

VBS Maintenance rigging team successfully completed critical work on a 2800 Rope Shovel.

Through careful planning, safe lifting procedures and skilled ex*****on, the project was completed efficiently and safely.

Proud of our team for upholding the highest standards on site.

πŸ“ž 078 455 9000
πŸ“§ [email protected]
🌍 www.vbsoffice.co.za�

Safely removed old vibrating screen and successfully installed the new one! πŸ’ͺπŸ”§Teamwork, precision, and safety at every s...
22/10/2025

Safely removed old vibrating screen and successfully installed the new one! πŸ’ͺπŸ”§

Teamwork, precision, and safety at every step β€” great job to everyone involved. πŸ‘·β€β™‚οΈβš™οΈ

πŸš› Lift & Transport of 12m Container – Successfully Completed! πŸ’ͺOur team safely lifted and transported a 12-meter contain...
12/10/2025

πŸš› Lift & Transport of 12m Container – Successfully Completed! πŸ’ͺ

Our team safely lifted and transported a 12-meter container with precision and efficiency. From planning to ex*****on, every step was handled with the highest safety standards and teamwork.

βœ… Safe lifting operation
βœ… Reliable transport
βœ… Professional crew and equipment

At VBS Maintenance, we make heavy moves look easy!
πŸ“ž Contact us for all your lifting, rigging, and transport needs.
🌐 www.vbsoffice.co.za

19/08/2025

PROJECT COMPLETION UPDATE πŸš§πŸ”§

➑️ Task: Replacement of Trip Drum – 2800 Shovel
➑️ Location: Mining Site Operations
➑️ Team: VBS Maintenance Rigging Crew

βœ… Successfully completed with safety, precision & efficiency!
Our experienced rigging team ensured a smooth replacement process, keeping downtime to a minimum and operations running strong. πŸ’ͺβš™οΈ

✨ Precision in Every Lift, Trust in Every Mile. ✨

🌍 Learn more: www.vbsoffice.co.za

VBS Maintenance has successfully completed the rigging and replacement of a 2800 shovel bucket – safely, efficiently, an...
10/08/2025

VBS Maintenance has successfully completed the rigging and replacement of a 2800 shovel bucket – safely, efficiently, and with precision. πŸ’ͺ🚧
Precision in Every Lift, Trust in Every Mile.

28/07/2025

βœ… Job Completed Successfully

VBS Maintenance proudly completed the hoist rope change-out on the shovel with precision and safety as top priorities.

Well done to our skilled rigging team for executing the task efficiently and ensuring minimal downtime.

πŸ”§βš™οΈ Trusted in heavy-duty maintenance and rigging solutions.

VBS Maintenance - Precision in every Lift, Trust in every Mile

www.vbsoffice.co.za

Vaughn Vollmer
18/07/2025

Vaughn Vollmer

βœ… VBS Maintenance is proud to have successfully executed the safe lift and move of a P&H 4100 dipper.

This heavy-duty rigging task was carried out with precision and care by our expert Rigging Team, ensuring zero incidents and full compliance with safety protocols.

πŸ› οΈ Job type: Heavy lift & move
πŸ‘· Team: VBS Maintenance Rigging Team
βœ… Status: Completed safely and professionally

Safety, skill, and strength.

Precision in every Lift, Trust in every Mile

Address

9 Essenhout Street
Kathu
8446

Alerts

Be the first to know and let us send you an email when VBS Maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category