01/09/2026
IRON ORE PROJECT LIMPOPO SOUTH AFRICA: JV PARTNER OR INVESTOR REQUIRED
Our client has a contract to process iron ore ROM for a mine in Limpopo, South Africa on a long term basis.
A JV partner that is able to supply the plant requirements as stipulated below, plus relevant yellow metal machinery, etc, and that will responsible for the full production process, is required.
Alternatively an investor that will provide the capital required.
In both instances a split of 70% JV Partner/Investor is proposed, but this is negotiable.
Please submit your full company profile to us if you are not a major established player in the iron ore industry, and supply us with details of the basis you would prefer to get involved in the project.
This request is posted on 1 September 2026 - please do not send us: "Is this available" messages.
Required monthly production 40,000 t/month
Design plant capacity 200 tph finished product
Recommended equipment design capacity 250 tph
Normal shift 12 hours
Two-shift operation 24 hours
Target product 10–13 mm
Plant availability target ≥85%
Feed material Iron ore
Primary crusher Heavy-duty jaw
Secondary crusher Cone
Tertiary crusher Cone
Final classification Vibrating screen
Crusher circuit Closed circuit
Product >13 mm Recycle
Product 10–13 mm Finished product
Product