28/08/2026
๐Mufakose, Harare
๐ง Borehole repair: Poly pipe flushing
Borehole repairs can become costly when problems are left unattended or when unsuitable materials are used during construction.
Today, our team carried out poly pipe flushing and recovery works on an 80m borehole, successfully restoring the borehole after casing failure. We then recommended installing 110mm Class 16 casing pipes as a strong solution to the borehole.
Removing the failed casings was not a viable option because the surrounding formation could collapse and completely close the borehole.
Unfortunately, the Class 6 casings eventually failed after we left the site, resulting in a total collapsing.
Book us for a proper geological survey and help you determine the appropriate casing size, class and construction method for the ground conditions present on your site.
Remember this:
The right advice before drilling can save you costly repairs later.
Get a free drilling quotation after the geological water survey.
๐ Call Us Today:
+263 788 841 883 | +263 782 990 723 | +263 711 882 292
๐ฒ WhatsApp:
https://wa.me/263788841883
https://wa.me/263782990723
๐ Visit Our Offices:
Corner Jason Moyo & First Street
Batanai Gardens, 1st Floor
Harare, Zimbabwe
Providing You Access to Naturally Sourced Water and Energy.