Shelforce

Call Directions Website Contact the business

Shelforce We are a window and door manufacturer and installer with a difference.

We can provide your project

Cost came through as the single biggest barrier to delivering healthy homes in our Awaab’s Law research.It is an importa...
09/11/2026

Cost came through as the single biggest barrier to delivering healthy homes in our Awaab’s Law research.

It is an important finding because it shows that knowing what needs attention and having the resources to act on it are not always the same thing.

Our white paper looks at the pressures housing providers are working through, alongside the wider questions around building performance, communication and readiness.

Read the full findings via the link in our bio.

05/11/2026

Enjoy the fireworks tonight, stay safe! 🎆

Condensation on a window tells you moisture is present. On its own, it doesn’t tell you why.Windows are often the coldes...
04/11/2026

Condensation on a window tells you moisture is present. On its own, it doesn’t tell you why.

Windows are often the coldest surface in a room, so they’re usually where moisture shows up first. But the cause can sit elsewhere in the home.

During the colder months, a few everyday steps can help manage moisture indoors:

◼️ Keep trickle vents open where fitted
◼️ Use extractor fans when cooking or showering
◼️ Let fresh air circulate
◼️ Keep the home consistently heated where possible

These steps help, but they’re only part of the picture. Persistent damp or mould can point to problems with ventilation, insulation, heating or the wider building fabric, and it should always be properly investigated.

A healthy home through winter comes from looking at the whole building, not blaming one cause.

If you’re a housing provider, feel free to share these tips with your residents. And if you’re reviewing windows and doors as part of your damp and mould plans, our team is happy to talk it through.

Send us a message or email [email protected].

Decisions made at design stage can create problems much later if window and door requirements have not been considered e...
30/10/2026

Decisions made at design stage can create problems much later if window and door requirements have not been considered early enough.

The 2026 edition of Approved Document L has now been published, with the new requirements coming into force for most relevant work on 24 March 2027, subject to transitional arrangements. Part Q continues to cover security requirements for new dwellings.

Our latest new-build guidance looks at what developers and specifiers need to consider before those decisions reach site.

It is much easier to resolve a specification question on the drawing than a few weeks before handover.

Full read: https://vist.ly/5qmyp

Go several storeys up and a different set of practical questions starts to matter.How will the windows be cleaned safely...
27/10/2026

Go several storeys up and a different set of practical questions starts to matter.

How will the windows be cleaned safely? What maintenance will they need over time? How will the opening style work at height? What sort of weather exposure will the building face?

These are all considerations when we talk about window specification for high-rise and local authority projects.

Performance figures matter, but they make more sense when considered alongside how the windows will actually be used and maintained.

Planning a high-rise or local authority project? Talk to our team early and we can help you work through the practical side of specification before it reaches tender: https://vist.ly/5q5vs

Making windows and doors is practical work. Sometimes the best way to see someone’s ability is to give them the opportun...
26/10/2026

Making windows and doors is practical work. Sometimes the best way to see someone’s ability is to give them the opportunity to show it.

That is why our recruitment approach can include trial days rather than relying solely on a traditional application process.

It gives people a practical way to demonstrate their skills, while helping us understand where they could fit within the team.

Inclusive employment works best when people have a fair chance to show what they can do.

uPVC offcuts are part of everyday production. Throwing useful material away should not be.Recycling is built into the wa...
19/10/2026

uPVC offcuts are part of everyday production. Throwing useful material away should not be.

Recycling is built into the way we handle production waste at Shelforce, helping material move back into use rather than simply becoming waste at the end of the line.

It is one of the less visible parts of manufacturing, but it still matters.

Good environmental practice often comes down to what happens behind the scenes, day after day.

Gladstone Street: Delivering a time-critical refurbishment programme.For this project, Shelforce was responsible for the...
16/10/2026

Gladstone Street: Delivering a time-critical refurbishment programme.

For this project, Shelforce was responsible for the design, manufacture and installation of windows and doors for Sandwell Council, working alongside main contractor Interclass plc.

With a strict programme to deliver, careful planning and coordination were essential. All deliveries were managed just-in-time, helping keep the installation programme moving and allowing both phases to be completed within just three weeks.

The project included PAS 24 security-enhanced rated windows and doors, alongside multiple enhanced design features to meet the requirements of the properties.

A great example of how experience, manufacturing capability and close collaboration help deliver successful refurbishment programmes.

Client: Sandwell
Main Contractor: Interclass plc

That was one of the findings from our recent white paper looking at Awaab’s Law readiness across the sector.More than ha...
13/10/2026

That was one of the findings from our recent white paper looking at Awaab’s Law readiness across the sector.

More than half of respondents told us they were either partially prepared, still working through the implications or not prepared yet.

For us, that shows there is still plenty of work to do and plenty of questions being worked through across social housing.

We carried out the research to get a clearer picture of where the sector stands and to help keep the conversation moving around healthy homes and readiness for change.

Our FREE Downloadable White Paper: https://vist.ly/5n6g6

Large refurbishment projects rely on careful planning behind the scenes.For this Birmingham City Council project, limite...
02/10/2026

Large refurbishment projects rely on careful planning behind the scenes.

For this Birmingham City Council project, limited site access and busy public highways meant every delivery needed to be carefully coordinated with the teams on site.

Across seven tower blocks, we supplied windows, doors and balcony infills for 238 flats, using just-in-time deliveries to keep the programme moving. The full project was completed in 18 weeks.

It’s a great example of the teamwork required to deliver large-scale refurbishment projects, from our manufacturing team in Birmingham through to the installation teams on site.

Birmingham City Council

Address

Birmingham
B240RD

Opening Hours

Monday 8am - 3pm
Tuesday 8am - 3pm
Wednesday 8am - 3pm
Thursday 8am - 3pm
Friday 8am - 12:30pm

Telephone

+441216035262

Alerts

Be the first to know and let us send you an email when Shelforce posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Shelforce:

Shortcuts

Share