Derecktor New York

Derecktor New York Today, four Derecktor facilities span the Eastern Seaboard of the U.S.

Founded in 1947, Derecktor Shipyards has since become a worldwide leader for excellence in the construction, repair and refit of yachts, commercial and military vessels.

09/03/2026

This 108' custom yacht came in for driveline service, including shaft seal service, cutlass bearing replacement, swim platform repairs, and running gear coatings, paired with hull bottom prep and anti-fouling application. She just launched successfully thanks to project management led by Derecktor’s Rob Hastie, our trades who executed the work, and our preferred partners for their support.

Next up is the sea trial.

08/27/2026

This 156’ Trinity is undergoing a full sundeck renewal. Here’s a quick preview of the mast installation.

Exciting news from Derecktor New York!🥳We’ve launched CAT 3, marking a major milestone in her build. The team also recen...
08/24/2026

Exciting news from Derecktor New York!🥳

We’ve launched CAT 3, marking a major milestone in her build.

The team also recently completed the vessel’s deadweight survey, conducted by DeJong & Lebet in coordination with the U.S. Coast Guard. This important step kicks off the stability calculations required for the vessel’s stability letter.

With CAT 3 now in the water, the team will move into sea trials and U.S. Coast Guard testing as we work toward an October delivery.

08/20/2026

On this 161’ vessel, our in-house paint crew handled the full scope from sanding and priming to full-hull tie coat and antifouling, all with a quick turnaround and results that speak for themselves.

The was made possible through Derecktor’s streamlined project management process, with Sam Mervosh leading the way.

08/17/2026

Our welding team is gearing up for ABS and Lloyd’s recertification, with each team member working from a dedicated station and getting guided, hands-on practice.

08/13/2026

Swim platform removal with everyone working seamlessly together at Derecktor Dania.

S/Y Raven post-launch at Derecktor Fort Pierce after seven months on the hard. ⛵️Full scope in our previous post.
08/11/2026

S/Y Raven post-launch at Derecktor Fort Pierce after seven months on the hard. ⛵️

Full scope in our previous post.

08/07/2026

The well-known RORC Transatlantic Race winner, S/Y Raven, is back on the water following an extensive yard period at Derecktor Fort Pierce. Led by Senior Project Manager John Resnik, the yacht received a comprehensive series of upgrades designed to enhance speed, efficiency, and overall performance.

The scope included paint and non-skid applications, interior flooring and surface upgrades, race coatings on wetted surfaces, weight reduction initiatives, including fishbowl window modifications and teak removal, as well as custom welding, fabrication, and machining, foil removal and replacement, keel operations, mast step support, and specialized carbon fiber, rigging, sail, and electrical work.

The launch marked a major milestone in the project, with the mast stepped shortly afterward as the team brought the project to completion. Stay tuned for a behind-the-scenes look at the mast stepping process in our next update.

Sunset views you won’t find anywhere else. The world’s largest sloop, M5, stretches 246.7 feet across the dock at Dereck...
07/31/2026

Sunset views you won’t find anywhere else. The world’s largest sloop, M5, stretches 246.7 feet across the dock at Derecktor Fort Pierce, making for a view that’s hard to top.

  | 2004The Miss Dania Beach was part of Bob Derecktor’s vision for the future of the Port Everglades waterfront. His pl...
07/30/2026

| 2004

The Miss Dania Beach was part of Bob Derecktor’s vision for the future of the Port Everglades waterfront. His plan was to repurpose the vessel as a floating work dock, extending her usefulness well beyond her years at sea.

Following Bob’s passing, that vision was never realized.

To honor his legacy, Derecktor donated the vessel to the City of Dania Beach, where she was intentionally sunk and transformed into an artificial reef. Today, the Miss Dania Beach continues to serve a purpose beneath the surface, supporting marine life and creating a destination for divers.

While her future looked different than Bob originally envisioned, her story continues.

Address

311 E Boston Post Road
Mamaroneck, NY
10543

Opening Hours

Monday 7:30am - 4pm
Tuesday 7:30am - 4pm
Wednesday 7:30am - 4pm
Thursday 7:30am - 4pm
Friday 7:30am - 4pm

Telephone

+19146985020

Alerts

Be the first to know and let us send you an email when Derecktor New York posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Derecktor New York:

Shortcuts

Share