11/02/2026
Step 1 of every pad site that's done right 👇
We cut this pad down to solid ground and graded it to have a slight pitch for water run off.
Next is the gravel so it does not rust from sitting in the wet dirt and is perfectly level so the doors open and close right.
Call for all of your building pad needs. Garages, homes, sheds, shipping container.
(931)-316-6092