Reddy 2 Demo

Directions Website Contact the business

Reddy 2 Demo Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Reddy 2 Demo, Demolition & excavation company, Melbourne.

Melbourne’s Best Strip Out & Partial Demolition Company
Family owned & proudly servicing all of Melbourne & Metro areas
♻️ Commercial
♻️ Industrial
♻️ Residential

Working with schools means taking child safety seriously. 👷‍♂️At Reddy2Demo, every team member holds a valid Working wit...
29/10/2026

Working with schools means taking child safety seriously. 👷‍♂️

At Reddy2Demo, every team member holds a valid Working with Children Check, supporting our readiness to undertake works in school environments.

For builders on education projects, that's one less clearance to chase before a crew can start on site.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Eastland Shopping Centre | Telstra Defit 👷‍♂️💚Full crew on deck for this Telstra defit at Eastland Shopping Centre. With...
27/10/2026

Eastland Shopping Centre | Telstra Defit 👷‍♂️💚

Full crew on deck for this Telstra defit at Eastland Shopping Centre. With the team working together, the project was completed in 3 days, right on schedule.

Strong teamwork and efficient delivery, keeping the program on track.

20/10/2026

Essendon, Victoria | Floor Removal. 👷‍♂️💥

Existing floors have to come up cleanly before any new flooring or fit-out can start. Whatever is left behind becomes the next trade's problem.

On this Essendon job, floor removal and waste disposal ran side by side, so the floor came up without debris piling up across the site.

That leaves the builder a cleared slab ready for the flooring and fit-out trades, not a backlog of old floor to deal with first.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Knowing Where the Waste Goes. 👷‍♂️💚The waste leaving a site is part of the scope, not an afterthought. On commercial and...
15/10/2026

Knowing Where the Waste Goes. 👷‍♂️💚

The waste leaving a site is part of the scope, not an afterthought. On commercial and insurance works, builders need to know it's been handled properly once it's out the gate.

Recycling is prioritised from the start of the works. Waste is tracked throughout, materials are diverted from landfill where possible, and anything being retained on site stays protected while the rest comes out.

The builder gets a cleared site with the waste accounted for, not a loose end to chase after handover.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Mickleham, Victoria | Rubbish Removal. 👷‍♂️💚You can't bring your next trade in while rubbish from the last stage is stil...
13/10/2026

Mickleham, Victoria | Rubbish Removal. 👷‍♂️💚

You can't bring your next trade in while rubbish from the last stage is still sitting on site. Left there, it slows them down and becomes a hazard for everyone working around it.

We clear it, dispose of it responsibly and finish with a final sweep before handing the site back to you.

You get a clear site, ready for your next trade, without chasing anyone to clean up first.

Need a site cleared before your next stage? Talk to our team.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Partial Demolition Is a Test of Precision, Not Power. 👷‍♂️💥On refurbishment and insurance jobs, the challenge is rarely ...
08/10/2026

Partial Demolition Is a Test of Precision, Not Power. 👷‍♂️💥

On refurbishment and insurance jobs, the challenge is rarely what comes down. It's protecting everything that stays.

Contents removal comes first, clearing the space methodically before any demolition begins. What goes and what stays is set out before works start, and only the scoped sections come down, with retained structure, services and finishes protected throughout. Clean-up runs alongside the works.

The outcome for the builder: a trade-ready site with retained structure intact, scope delivered and programme protected.

Built for builders.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Taking Walls Back to the Frame. 👷‍♂️💥Plaster and wall linings come out on most strip-outs. How they come out decides wha...
06/10/2026

Taking Walls Back to the Frame. 👷‍♂️💥

Plaster and wall linings come out on most strip-outs. How they come out decides what the next trade walks into.

Linings are cut and removed in controlled sections with full PPE on, taking each wall back to its frame while protecting the structure behind it.

For the builder, that means an open frame you can inspect and plan from, rather than a next stage that starts by working around old linings.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Keeping Your Programme on Track. 👷‍♂️💚Builders rarely lose time because a crew worked slowly. They lose it when a subcon...
03/10/2026

Keeping Your Programme on Track. 👷‍♂️💚

Builders rarely lose time because a crew worked slowly. They lose it when a subcontractor turns up short, stops at the first surprise, or leaves a site needing days of making good.

We plan against all three. Crew and plant are set against the programme before the works are booked in, works are sequenced so one hold-up doesn't stop the rest, and where the site doesn't match the drawings, you hear about it straight away.

Planning your next demolition window? Get in touch with our team.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Overhead Strip-Out, Section by Section. 👷‍♂️💥Ceilings are often the slowest part of an internal strip-out. The work is o...
02/10/2026

Overhead Strip-Out, Section by Section. 👷‍♂️💥

Ceilings are often the slowest part of an internal strip-out. The work is overhead, dusty and close to the services running through the space.

Our crew takes it back section by section, with handheld tools and full PPE on, clearing one area before moving to the next.

The result is a soffit taken back and ready for the next trade to start work overhead.

Got a strip-out coming up? Get in touch with our team.

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Carlton North | Station Terrace 👷‍♂️💥Built in 1889, Station Terrace is entering its next chapter.Our team is on site car...
26/09/2026

Carlton North | Station Terrace 👷‍♂️💥

Built in 1889, Station Terrace is entering its next chapter.

Our team is on site carrying out the renovation strip-out for Ahead Building, carefully removing existing elements while setting the property up for what comes next.

With the front set to be restored and the rear extended for new living spaces and a terrace, it's a great example of old character making way for a new chapter.

Builder: Ahead Building

📲 1300 330 654
đź“§ [email protected]
đź’» www.reddy2demo.com.au

Address

Melbourne, VIC

Alerts

Be the first to know and let us send you an email when Reddy 2 Demo posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Reddy 2 Demo:

Shortcuts

Share