06/10/2026
Not your average MVHR install… 🌬️
Another Ubbink Ubiflux MVHR system wrapped up by the Herts Renewables team, installed in the basement of this listed property which has been converted into offices.
The system serves 5 individual office spaces, continuously supplying fresh, filtered air while extracting stale air and recovering heat from the building that would otherwise be lost.
This one took some serious planning. With limited space and the need to keep boxing and visible ductwork to an absolute minimum, every route had to be carefully considered before installation.
Some of the existing walls were up to 600mm thick, requiring specialist core drilling to achieve the duct routes we needed. 💪🏼
The result — fresh air, excellent heat recovery and minimal visual impact, while making the most of the available space and respecting the fabric of the listed building.
Good MVHR isn’t just about the unit — the design and installation make all the difference. 💯
Big thanks to Richard Edwards for the supply and design work, as always 🤝
📩 Planning a renovation, conversion, new build or commercial project? Get in touch with Herts Renewables for complete MVHR design, supply and installation.