CK Gold Project

CK Gold Project We're an advanced stage gold & copper project, located at the historic Silver Crown Mining District.

With major permits secured, road construction underway and a strong 2026 Feasibility Study, the CK Gold Project is gaini...
09/05/2026

With major permits secured, road construction underway and a strong 2026 Feasibility Study, the CK Gold Project is gaining attention from potential partners and buyers as it moves closer to a final construction decision.

Read more:

US Gold Corp Evaluates M&A Interest as CK Gold Project Advances

Completing state permitting changed the conversation.

With the Mine Operating Permit and air quality permit secured and access road construction already underway, U.S. Gold Corp (NASDAQ: USAU) has drawn interest from development capital providers and potential M&A counterparties. The board has formed a Special Committee and appointed financial advisors to weigh joint ventures, asset-level deals and corporate transactions against building CK Gold independently.

The March 2026 Feasibility Study puts the after-tax NPV at $632 million with a 27% IRR and 2.5-year payback, based on $3,250/oz gold and $4.50/lb copper. At recent spot gold near $4,500/oz, that NPV rises to roughly $1.37 billion and payback compresses to 1.6 years.

With about 16.5 million shares outstanding, per-share exposure to that value is unusually concentrated.

A final construction decision is targeted for the second half of 2026. Strategic discussions carry no guarantee of a completed transaction.

Read more on Crux Investor — article by Imogen Minall: https://www.cruxinvestor.com/posts/us-gold-corp-evaluates-m-a-interest-as-ck-gold-project-advances

Did you know? An estimated two-thirds of the copper produced since 1900 is still in use today.Copper can be recycled aga...
08/31/2026

Did you know?

An estimated two-thirds of the copper produced since 1900 is still in use today.

Copper can be recycled again and again without losing the properties that make it so useful. That makes it an important resource for power, transportation, construction and more.

Big things ahead! With permits in hand and the project ready for construction, U.S. Gold Corp is focused on moving the C...
08/27/2026

Big things ahead! With permits in hand and the project ready for construction, U.S. Gold Corp is focused on moving the CK Gold Project forward:

U.S. Gold Corp. (NASDAQ: USAU) has reached a major inflection point as its flagship CK Gold Project in southeast Wyoming transitions from exploration to a fully permitted, shovel-ready development asset.

Backed by a robust March 2026 Feasibility Study, CK Gold continues to attract interest from potential sources of development capital as well as prospective M&A counterparties. The Company has engaged advisors and formed a Special Committee to evaluate M&A interest while remaining focused on advancing CK Gold and unlocking additional value beyond the current Feasibility Study.
U.S. Gold Corp. is also evaluating the potential spin-out of its Keystone Project in Nevada as a standalone exploration company, creating a potential pathway to advance Keystone while minimizing additional dilution for USAU shareholders.

Read More - https://www.usgoldcorp.com/news-media/press-releases/detail/251/u-s-gold-corp-provides-ceo-update---august-2026

08/24/2026

255 jobs at the mine + more across the local economy.

Each direct job is expected to support at least five more jobs in our community.

Central banks continue to buy gold at a record pace, underscoring strong global demand for the metal. Read on. 👇
08/21/2026

Central banks continue to buy gold at a record pace, underscoring strong global demand for the metal. Read on. 👇

Central Bank Gold Buying Holds Through Fed Rate Uncertainty

Central banks bought a record 288.9 tonnes in Q2 2026, up 62% year-over-year. Supply stayed flat.

U.S. Gold Corp's CK Gold project is modelled at $3,250/oz — well below ~$3,800 consensus — and still shows a $632M after-tax NPV5% and 27% IRR.

Read more on Crux Investor: https://www.cruxinvestor.com/posts/central-bank-gold-buying-holds-through-fed-rate-uncertainty

A new chapter in Wyoming mining is taking shape in southeast Wyoming. ✨Wyoming has a long history of mining, but new har...
08/17/2026

A new chapter in Wyoming mining is taking shape in southeast Wyoming. ✨

Wyoming has a long history of mining, but new hard rock mines are rare. The CK Gold Project is now fully permitted at the state level and moving closer to construction just west of Cheyenne.

We’re proud to build on to the Cowboy State’s legacy of mining.

The CK Gold Project is permitted and ready to move forward. ⚒A recent feasibility study shows strong project economics, ...
08/14/2026

The CK Gold Project is permitted and ready to move forward. ⚒

A recent feasibility study shows strong project economics, an 11-year mine life and room for the resource to grow. And with more mineralization found beyond the current reserve area, our story is just beginning.

U.S. Gold Corp. CK Gold is fully permitted. Reserve-backed. And ready to build.

Our gold-copper project sits approximately 20 miles from Cheyenne, Wyoming — just 2.5 miles off the Interstate 80 corridor, with power being extended from 16 miles away and a major aggregates operation already running two miles south. The infrastructure is in place. The permits are in hand.

What the Definitive Feasibility Study shows:
• $632 million after-tax NPV5%
• 27% after-tax IRR
• 11-year mine life
• ~2.5-year payback
• 1.6 Moz gold-equivalent reserve

And we believe the story keeps growing. 80% of drill holes extending beyond the current reserve boundary continued to show mineralization, with additional lateral targets identified through geophysics.

Read More - Crux Investor

https://www.cruxinvestor.com/posts/the-financing-test-behind-us-gold-corps-ck-gold-development

Did you know the history of the CK Gold Project reaches back more than a century? Mining activity took place at the site...
08/10/2026

Did you know the history of the CK Gold Project reaches back more than a century?

Mining activity took place at the site in the late 1800s and early 1900s, followed by the first reported modern drilling program in 1938. Since then, multiple companies and the U.S. Bureau of Mines have used drilling, mapping, sampling and geophysical surveys to better understand the deposit.

New from Crux Investor: Eight key takeaways from the CK Gold Feasibility Study, including full permitting, strong projec...
08/06/2026

New from Crux Investor: Eight key takeaways from the CK Gold Feasibility Study, including full permitting, strong project economics, an 11-year mine plan and additional resource potential in Wyoming. Take a closer look. 🔎

U.S. Gold Corp completed its CK Gold feasibility study, showing a permitted, financeable Wyoming mine with strong estimated value and clear next steps.

08/03/2026

Located west of Cheyenne, the CK Gold Project has a clear path for development. The fully permitted project is designed to produce gold, copper and other valuable minerals while creating jobs, supporting schools, and helping meet America’s growing need for domestic resources. Follow our page to stay up to date.

Address

1807 Capitol Avenue Suite 101E
Cheyenne, WY
82001

Alerts

Be the first to know and let us send you an email when CK Gold Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CK Gold Project:

Shortcuts

Share

Category