09/03/2026
Getting ready for the pour. 🔥
This Creatherm installation is prepped and ready the next thing through the door will be the concrete pump truck.
There’s something impressive about seeing an entire floor covered in Creatherm Radiant Floor Panels before the concrete goes down. The interlocking grid creates a solid, insulated base while providing a fast, organized system for laying out and securing the radiant tubing.
Once the tubing is installed and the concrete is poured, most of this disappears from sight, but it will keep doing its job underneath that slab for years to come.
Build it right from the ground up. Build it with Creatherm. Fast. Easy. Saves Labor. Just Walk It In!
Radiant ready.
Pump truck up next.
Concrete coming soon.