Global Road Technology

Directions Website Contact the business

Global Road Technology GRT are the specialists in dust control, dust suppression, soil stabilisation, erosion control, and sediment control.

GRT is an international engineering technology company focussing on providing innovative, engineered solutions for mining, civil and resource sectors offering dust control, soil stabilization, erosion control and water management solutions. We are an international, engineering technology company focusing on providing innovative products and solutions for the mining, civil, agricultural, resources, land development, and environmental management sectors. GRT’s industry leading technology is proven to drive process efficiency, deliver sustainable infrastructure outcomes, and improve community health, safety and environmental outcomes.
GRT's foundation is engineering excellence and innovation. With highly experienced chartered engineers forming the core of our team, If your not receiving an engineered solution, your dealing with the wrong company.

Which unsealed roads should your council treat for dust first?A dust suppression program gives works teams a documented ...
17/11/2026

Which unsealed roads should your council treat for dust first?

A dust suppression program gives works teams a documented way to decide which unsealed roads get treated, with what, and from which budget. Our new template sets it out in five steps: adopt warrant criteria and a complaint procedure, score each road segment in a prioritisation matrix, match treatments to segments, build the budget on whole-of-life cost, and run a monitored trial on your own gravel before scaling up.

According to ARRB’s Best Practice Guide for Unsealed Roads, about 575,000 km of Australia’s roughly 900,000 km road network is unsealed, and local government is responsible for more than three quarters of the network. On priority segments such as bus routes and roads near homes and schools, polymer options like GRT: Haul-Loc are designed to help keep dust down between maintenance cycles.

Read the full template: https://globalroadtechnology.com/council-dust-suppression-program-template/

There is no single right haul road dust suppressant. There is the one that suits your road.The three main chemistries ea...
13/11/2026

There is no single right haul road dust suppressant. There is the one that suits your road.

The three main chemistries each fit a different kind of road. Bitumen emulsion cures into a bound, water-shedding seal that suits permanent, stable primary roads, but grading or re-profiling breaks the seal, and re-establishing it needs specialist plant. Lignosulphonate is a low-cost binder that performs well in dry conditions, but it is water-soluble, so heavy rain leaches it out and forces re-application. Polymer suppressants such as GRT: Haul-Loc are dosed through the existing water cart and are designed to help bind fines into the wearing course with each pass, so the road can still be graded and re-treated as part of routine maintenance.

The deciding question is not which chemistry wins on paper, but how long the road will exist in its current form, and what maintenance will do to it. Permanent trunk roads can justify a bitumen seal. The semi-permanent network of ramps and dump access roads, which is graded and re-worked often, is where a polymer program tends to fit. For temporary roads, anything that needs heavy set-up makes little sense.

Price per litre is the least useful number here. The real comparison is total cost across the road’s life: set-up, re-treatment, watering displaced, grading displaced, and how much it costs to change your mind.

Learn more: https://globalroadtechnology.com/bitumen-emulsion-vs-lignosulphonate-vs-polymer-haul-roads/

On a haul road, water fixes a problem you can see and creates one you cannot.Overwatering haul roads for dust control cu...
12/11/2026

On a haul road, water fixes a problem you can see and creates one you cannot.

Overwatering haul roads for dust control cuts tyre traction and increases braking distance. The NSW Resources Regulator reported 20 incidents between January 2017 and February 2018 where overwatering, or water on roads, led to loss of control of a vehicle, which it noted was almost one-third of all loss-of-control incidents reported in that period.
In Queensland, the mines inspectorate has gone further. Its safety bulletin on uncontrolled movement found that watering or excessive watering was the primary cause in 46% of such incidents, that 59% took place on ramps, and that watering a clay-surfaced road can reduce its frictional coefficient by 30%.
The issue is rarely carelessness. Dust gives instant feedback while a loss of traction does not, and watering often runs on fixed schedules rather than road conditions.

The answer is not less dust control, but making each litre of water do more. GRT: Haul-Loc is designed to be dosed through the existing water cart, so polymers help bind fines into the wearing course and each pass lasts longer. SMART Dosing Units keep the concentration right on every fill, and their dosing logs provide a record of how the road was treated.

Learn more: https://globalroadtechnology.com/overwatering-haul-roads/

Mine Site Rehabilitation Guide for Australian OperationsMine rehabilitation is no longer something left for closure. In ...
10/11/2026

Mine Site Rehabilitation Guide for Australian Operations

Mine rehabilitation is no longer something left for closure. In Queensland, a progressive rehabilitation and closure plan (PRC plan) under the Environmental Protection Act 1994 must include a schedule that states the proposed post-mining land use, each rehabilitation milestone required to achieve a stable condition for the land, and when each milestone is to be achieved. That puts rehabilitation on the same timeline as mining itself. Progressive rehabilitation means restoring areas as they become available, rather than letting a large disturbed footprint build up until the end of mine life.

It also gives operations something closure-only programmes miss: early feedback. Poor germination on the first areas can change species selection for the next, and erosion on an early batter can change how the following landforms are shaped. The practical work starts well before seeding: keeping topsoil and subsoil separate, shaping landforms with drainage in mind, and protecting the surface while vegetation takes hold, as newly seeded ground can be especially vulnerable to rain. GRT: Enviro-Binder can be sprayed over seeded areas and is designed to help protect the seed bed from wash-off while plants establish, and GRT: Nature Plus, a liquid polymer containing phosphorus and nitrogen, is designed to support germination and strike rates. Rehabilitate as you go, and closure becomes the last step of a plan that has been running all along.

Read the full article: https://globalroadtechnology.com/mine-site-rehabilitation-guide-for-australian-operations/

Dust Management Plans for Australian Mining ComplianceA Dust Management Plan is only as useful as what happens on site a...
05/11/2026

Dust Management Plans for Australian Mining Compliance

A Dust Management Plan is only as useful as what happens on site after it is written. The plans that hold up tend to share the same structure. They start with a site-specific inventory of every dust source: drilling, blasting, excavation and loading, haul roads, crushing and screening, stockpiles and tailings. They apply controls to each source in the right order. The NSW Resources Regulator states that controls must follow the hierarchy of controls (elimination, substitution, engineering, administrative and lastly personal protective equipment) and describes PPE as a last line of defence against exposure. They set up monitoring that shows whether those controls are working, from personal exposure sampling to fixed and real-time monitors. And they are reviewed as the operation changes, rather than filed once and forgotten.

Where plans tend to fall short is generic templates that do not reflect the real site, controls written into the plan but not fully resourced, and monitoring that misses the worst conditions. This is where engineering controls at the source come in. GRT: Haul-Loc is designed to help bind fines into the haul road wearing course between passes, GRT: Activate is a wetting agent designed to help sprays at crushers and transfer points wet fine dust that plain water struggles to, and SMART Dosing Units are designed to meter each application and keep a record of it, which helps when a plan needs to show its controls were actually applied. A plan that names its sources, follows the hierarchy and checks its own results is a plan you can stand behind.

Read the full article: https://globalroadtechnology.com/dust-management-plans-for-australian-mining-compliance/

Mining & Construction Erosion Control Compliance & SolutionsEvery mining operation and construction project that disturb...
03/11/2026

Mining & Construction Erosion Control Compliance & Solutions

Every mining operation and construction project that disturbs soil creates an erosion risk. Once vegetation is cleared, topsoil is stripped or batters are cut, the exposed surface can be displaced by raindrop impact, overland flow and wind, and that sediment ends up in drains, sediment basins and waterways. In Queensland, the Environmental Protection Act 1994 says a person must not unlawfully deposit prescribed water contaminants, including earth (sand, soil, silt or mud), in waters, a roadside gutter or stormwater drainage, and Transport and Main Roads specification MRTS52 (March 2025) sets out erosion and sediment control requirements for transport infrastructure projects. In NSW, the Guidelines for erosion and sediment control on building sites (October 2024) state that the most important part of erosion and sediment control is preventing erosion.

Many erosion and sediment control programmes lean heavily on capture measures such as silt fences, check dams and sediment basins. They have their place, but they catch sediment after it has already moved, they need regular maintenance, and they can struggle under concentrated flow. Treating the source changes the order of work: stabilise the exposed surface first, so less sediment is mobilised to begin with. GRT: Enviro-Binder is a polymer soil binder sprayed onto exposed surfaces by water truck or hand spray, so large disturbed areas can be treated without installing blankets or matting by hand. It is designed to bind the surface layer and help protect it from raindrop impact and overland flow between rehabilitation campaigns. Treat the source first, and there is less to capture downstream.

Read the full article: https://globalroadtechnology.com/mining-construction-erosion-control-compliance-solutions/

Coal Dust Exposure Limit in QLD and NSW: 1.5 mg/m3 ExplainedThe respirable coal dust exposure limit in Queensland and Ne...
30/10/2026

Coal Dust Exposure Limit in QLD and NSW: 1.5 mg/m3 Explained

The respirable coal dust exposure limit in Queensland and New South Wales coal mines is 1.5 mg/m3, averaged over an 8-hour shift, set under each state’s mining safety legislation and administered by RSHQ in Queensland and the NSW Resources Regulator. What can catch operations out is that the headline number is not necessarily the number results are judged against. The 1.5 mg/m3 limit assumes an 8-hour shift with time to recover before the next one. On the 12-hour rosters many coal mines run, workers can be exposed to more dust per shift with less recovery time between shifts, so an appropriately qualified person, such as an occupational hygienist, should determine whether the limit needs adjusting. A site sitting just under 1.5 mg/m3 on paper can be over the shift-adjusted figure it is actually assessed against. The limit was lowered to 1.5 mg/m3 in Queensland in 2020 and in New South Wales in 2021.

The NSW Resources Regulator notes a recent resurgence in identified cases of coal worker pneumoconiosis, also known as black lung disease. Ventilation and PPE remain essential, but on their own they may not be enough across a full roster. Controlling dust at each source is the most effective place to start: GRT: Activate UG added to the water feeding cutting and bolting sprays helps capture fine coal dust at the face, binding underground roadways helps reduce traffic re-suspending settled dust, GRT: Haul-Loc is designed to help keep wheel-generated fines bound into surface haul roads, and GRT: 12X is designed to help suppress the dust that drilling releases. Each aims to reduce dust in the air rather than only managing a worker’s exposure to it, which matters more on longer rosters, where the effective limit is lower.

Read the full article: https://globalroadtechnology.com/coal-dust-exposure-limit-qld-nsw/

Dust Extinction Moisture: Turning “Is This Dusty?” Into A Number“Is this coal too dusty?” is often an argument on site. ...
29/10/2026

Dust Extinction Moisture: Turning “Is This Dusty?” Into A Number

“Is this coal too dusty?” is often an argument on site. Dust Extinction Moisture, or DEM, turns it into a number. DEM is the moisture content at which coal effectively stops generating significant dust, measured under Australian Standard AS 4156.6 using a rotating drum test. Below that moisture level, dustiness rises; at or above it, dust drops to a low level. It gives an operation a measured target for how much moisture a specific coal needs to travel, transfer and stockpile with minimal dust and, just as useful, the point beyond which extra water adds little. That second part matters more than it sounds, because above the DEM, extra moisture mostly adds cost: you freight water in every wagon, you lower the as-received calorific value a buyer pays for, and over-wet fines can bridge in bins and blind screens. So the target is not maximum wetness, it is a band at or just above DEM.

The hard part is holding a moving product inside a narrow window while weather, blending and transit drying all push it around. Which is why the useful question is not how to add more water, but how to make the water you add count for more. The finest particles are hard to wet and tend to slip past plain water droplets, so some of the water drains or evaporates before it reaches the dust. GRT: Activate is a wetting agent designed to lower water’s surface tension, helping each litre wet more of the fines. It is designed to help treated coal reach dust extinction at lower added moisture than water alone: a similar dust result from less water, or a better result from the same water. Lower product moisture and lower water demand, guided by one number you can actually put in a contract.

Read the full article: https://globalroadtechnology.com/dust-extinction-moisture-dem/

Haul Road Dust Suppression: The Complete GuideIf you control dust in only one place on a surface mine, it should be the ...
27/10/2026

Haul Road Dust Suppression: The Complete Guide

If you control dust in only one place on a surface mine, it should be the haul roads. They are one of the largest sources of dust on a surface mine, and the reason is physical: a loaded haul truck grinds its wearing course into finer and finer material with every pass, then its wheels and turbulence throw that material back into the air. Unlike a blast or a stockpile, a haul road keeps regenerating its own dust supply. That is why controlling the haul roads makes the biggest difference to a site’s dust profile, and why they are one of the highest-leverage places to act.

Uncontrolled haul road dust is not just an environmental line item either. It is a safety risk, because dust clouds behind trucks reduce visibility on roads carrying heavy payloads, and the respirable fraction reaches operators, spotters and maintenance crews. It is a water problem, because plain water on an unsealed road is a short-lived fix, so carts run and rerun the same circuit and consume large volumes. And it is a maintenance problem, because fines lost to the air are road material lost, so dustier roads degrade faster and demand more grading. The fix is not simply more watering. It is an engineered wearing course, a binding suppressant applied through metered dosing of the water cart, and application coordinated with grading, so the treatment lives inside the road rather than sitting on top of it. GRT: Haul-Loc through SMART Dosing Units binds the fines into the wearing course and holds them there between passes, so the road stays bound instead of needing a fresh soak every time a cart comes round. Get the haul roads right, and it makes a real difference to the rest of the site’s dust control.

Read the full article: https://globalroadtechnology.com/haul-road-dust-suppression-guide/

Dust Control for Quarries and Aggregate OperationsQuarries sit in a tricky spot for dust. They process hard rock, granit...
23/10/2026

Dust Control for Quarries and Aggregate Operations

Quarries sit in a tricky spot for dust. They process hard rock, granite, limestone, sandstone, basalt, that is high in crystalline silica, they generate dust at every stage from drilling and blasting to crushing, screening and hauling, and they usually sit much closer to homes, schools and roads than a remote mine. For years, quarry dust was treated as a lower priority than mining. That has changed: the crystalline silica rules now apply across the sector, quarries included, and the respirable crystalline silica exposure limit for quarries is 0.05 mg/m3, the same as the limit that applies to large mines. The regulations do not scale down for a smaller operation.

The catch is that many smaller quarries run a couple of haul trucks, one shared water truck, and no dedicated environmental team, so the solutions have to fit that reality. They can. GRT: Haul-Loc dosed through SMART Dosing Units keeps haul road dust down with far less watering, which on a single-truck site frees that truck for other work. GRT7000 stabilisation firms up a wearing course often built from reject material, so it ruts and corrugates less and needs grading less often, freeing the grader for the pit and stockpiles. GRT: Activate goes into the existing spray bars on crushers and screens, designed to be up to 12x more effective than water alone on fine dust, and it moves with a mobile plant when it relocates. GRT: Enviro-Binder veneers stockpiles and exposed boundaries against the wind erosion that drives many community complaints. Quarries are not small mines, but the dust standards are the same, and the solutions can be built to a quarry’s scale.

Read the full article: https://globalroadtechnology.com/dust-control-in-quarry-aggregate-operations-a-practical-guide/

Address

Unit 32/3-15 Jackman Street
Southport, QLD
4215

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Alerts

Be the first to know and let us send you an email when Global Road Technology posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Global Road Technology:

Shortcuts

Share

Nearby businesses