06/09/2026
The world's largest wind monopile manufacturing facility required hazardous-area electrical installation delivered inside a live, multi-contractor construction programme.
Tight sequencing, congested access, a coating and paint-spray booth environment with zero margin for error.
We supplied and installed power outlet points, distribution boards, transformers and cable containment, then tested and certified the lot, with dedicated project engineering and supervision throughout.
The result: fully certified electrical services across all coating booth areas, and a facility ready for commissioning.
Read the full case study here: https://www.fes-ex.com/case-studies/ses-engineering-services/