29/05/2026
Siaosi talks us through the membrane application process for this screed seal at the Bellevue Hill project for
Prior to this stage, the primary waterproofing membrane had already been completed throughout the gym and laundry area. This process is all about preparing the substrate correctly before screed application, ensuring the system performs as intended and maintains long term durability.
Every stage matters from surface preparation and detailing through to membrane consistency and coverage. Proper waterproofing isn’t just about compliance, it’s about protecting the build long after the finishes go down.
Another quality installation underway 👌