Ace Aero Ace Aero provides services for light aircraft owners

At Leuchars today for another RV tail attachment bolt measuring session - no issues for this aircraft. Another one to ch...
27/08/2026

At Leuchars today for another RV tail attachment bolt measuring session - no issues for this aircraft. Another one to check this Monday coming.

Another MTD-07-2026 / SB-00134 inspection today, this time at Scottish Aero club More difficult access on a RV8 compared...
26/08/2026

Another MTD-07-2026 / SB-00134 inspection today, this time at Scottish Aero club More difficult access on a RV8 compared to a ‘6 or ‘7!

The first of a few MTD-07-2026 / SB-00134 inspections. This one on an RV-6 but is applicable to RV-4, 6, 7 & 8. You have...
24/08/2026

The first of a few MTD-07-2026 / SB-00134 inspections. This one on an RV-6 but is applicable to RV-4, 6, 7 & 8. You have 10 flying hours or 90 days to make this check and get it signed off.

A recent inspection found this AN3 bolt with a shaven head in part of a flying control system. It wasn’t interfering wit...
14/08/2026

A recent inspection found this AN3 bolt with a shaven head in part of a flying control system. It wasn’t interfering with another part so must have been installed like that! Removed and replaced with a new serviceable bolt.

LAA Engineering have released a new Technical Leaflet on Lifed Components (TL 2.34)Components that have manufacturer rec...
14/08/2026

LAA Engineering have released a new Technical Leaflet on Lifed Components (TL 2.34)

Components that have manufacturer recommended replacement or overhaul intervals are now to be listed in your maintenance records, including the reason for any deviations from manufacturers recommendations. Where deviations are made you must justify this decision and define the inspection or monitoring arrangements to ensure continued airworthiness.

These will be reviewed with your inspector at each Annual Airworthiness Review. If you’d like more info, send a message.

A recent job to remove and treat some surface corrosion with alodine, before priming and painting. This was a case of th...
01/08/2026

A recent job to remove and treat some surface corrosion with alodine, before priming and painting. This was a case of the more you look the more you find!

23/07/2026

Some leak hunting today on a pitot system. Three connections on the hard line checked and finally traced to the connection at the ASI. Now fixed and ready for weekend flying.

Wheel Bearing Service - Cleaned, inspected, repacked with fresh grease, and reassembled. And of course a new split pin f...
20/07/2026

Wheel Bearing Service - Cleaned, inspected, repacked with fresh grease, and reassembled. And of course a new split pin for the wheel nut!

Build inspections yesterday on a RV12. No major snags for this experienced builder but there’s always something that nee...
17/07/2026

Build inspections yesterday on a RV12. No major snags for this experienced builder but there’s always something that needs attention!

Quick machining job today to adapt some wheel nuts so that an axle jack can be used. This mod is common for round leg ai...
14/07/2026

Quick machining job today to adapt some wheel nuts so that an axle jack can be used. This mod is common for round leg aircraft. VansAircraftBuilders.com Van's Aircraft

Address

Highlands And Islands Airports
Inverness
IV2 7JB

Website

Alerts

Be the first to know and let us send you an email when Ace Aero posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share